1- The parts using at welding joining must be clean and without damage.The pipes
to be used in the wekding operation,if it is necessary necessary to be cutted, they must be cut with a strong and sharp pipe scissor.
2- Welding must be done at 260’ C. The cutting parts must be placed at the welding machine at 260’ C and the parts must be waited in their place without moving. The parts according to the their.
3- Heated parts are carefully pulled from screw plate and passed to each other.
Joining parts in a few second are completely got cold, they
4- Joined parts must not be moved. They are waited until get cold.
5-In this manner a good joining (welding)
is executed. In this figure you can see a welding operation executed carefully and the section of the welded part. A well executer welding operation makes longer the